First Coat of Stucco
Brown coat of Stucco is finished on custom home being rebuilt in Stump Canyon.
The foam and lath has been started on the custom home we are rebuilding after being lost in Monument Fire.
Designs can be transferred to a stained concrete floor by sandblasting over a custom built template. These are options that are ususally done in the front entry of a new custom home.
New Custom Home in the Huachuca Mountains. Framing for second story is being completed.
Floor Trusses and Floor framing are now in place, ready for the second story. This custom home in Ash canyon is being rebuilt after being lost in the Monument Fire
The drywall has been hung in the custom home we are rebuilding on Mesquite Tree Ln after home was lost in the Monument Fire.