Setting Up Forms For Stem Walls
We will be ready to pour concrete into the stem walls. More progress on the House we are rebuilding from the Monument Fire.
Fireplace has been stuccoed on house in Stump Canyon
Floor Trusses and Floor framing are now in place, ready for the second story. This custom home in Ash canyon is being rebuilt after being lost in the Monument Fire
The electrical, plumbing, and HVAC for the house on Stump Canyon in Hereford, AZ is coming to a close.
Framing is almost finished on the custom home we are rebuilding after it was lost in Monument Fire
Water has been added to to the construction site